See important
guidance on the use of this record.
If you have any comments or new information about this record, please email us.
HER Number: | MDV60901 |
---|
Name: | BRIDGE in the Parish of Broad Clyst, Clyst Honiton, Sowton |
---|
Summary
The modern bride was built in 1821, but a bridge (or bridges) over the clyst was referred to in 1478, 1792 + 1807.
Location
Grid Reference: | SX 985 935 |
---|
Map Sheet: | SX99SE |
---|
Admin Area | Devon |
---|
Civil Parish | Broad Clyst |
---|
Civil Parish | Clyst Honiton |
---|
Civil Parish | Sowton |
---|
District | East Devon |
---|
Ecclesiastical Parish | BROADCLYST |
---|
Protected Status: none recorded
Other References/Statuses
- Old DCC SMR Ref: SX99SE/216/1
Monument Type(s) and Dates
- BRIDGE (XVIII to XXI - 1751 AD to 2009 AD (Between))
Full description
OR BRIDGES, Untitled Source (Migrated Record). SDV111108.
The modern bride was built in 1821, but a bridge (or bridges) over the clyst was referred to in 1478, 1792 + 1807.
Untitled Source (Migrated Record). SDV111110.
Wessex archaeology/a30 honiton to exeter improvement, devon 1996-9. Clyst honiton bridge culvert works/(1999)1,3/(wa report 42415.1).
Wessex Archaeology, Untitled Source (Migrated Record). SDV22831.
Present bridge widened in 1975 (wessex archaeology).
Bryant, A., 2007, East of Exeter Major Scheme Bid M5 Junction 29 and Old A30, Exeter, Devon: Historic Environment Desk-based Assessment, 9 (Report - Assessment). SDV345164.
Other details: Appendix 1, site 48.
Sources / Further Reading
SDV111108 | Migrated Record: OR BRIDGES. |
SDV111110 | Migrated Record: |
SDV22831 | Migrated Record: Wessex Archaeology. |
SDV345164 | Report - Assessment: Bryant, A.. 2007. East of Exeter Major Scheme Bid M5 Junction 29 and Old A30, Exeter, Devon: Historic Environment Desk-based Assessment. Wessex Archaeology Report. 63771.01. A4 Stapled + Digital. 9. |
|
| |
Associated Monuments: none recorded
Associated Finds: none recorded
Associated Events
- EDV4887 - Assessment Two Areas of Highway to the East of Exeter
Date Last Edited: | Mar 13 2020 8:00AM |
---|
Search results generated by the HBSMR Gateway from exeGesIS SDM Ltd.