ID: | SDV56242 |
---|
Title: | 4 & 6 Chains Road, Sampford Peverell: Desk-based assessment |
---|
Originator: | Southwest Archaeology |
---|
Date: | 2004 |
---|
Summary: | The building of the Grand Western Canal was proposed by an act of Parliament in 1796 & engineered by John Rennie. The route was to be from Topsham to Taunton with another canal linking Bridgwater to Weston-Super-Mare. The canal eventually reached Taunton in 1838 but never reached Topsham. The Taunton section of the canal fell into disuse in 1867 & the Tiverton section in 1924. In 1962 a Tiverton Canal Preservation Committee was established & the remaining section of canal was managed by Devon County Council for leisure purposes in 2004. |
---|
Associated Monuments (6)
MDV71106 | Boundary Walls at 4 & 6 Chains Road, Sampford Peverell (Monument) |
MDV11474 | Castle, Sampford Peverell (Monument) |
MDV22051 | Chains Farm House (Monument) |
MDV1497 | Grand Western Canal (Monument) |
MDV11473 | Sampford Barton (Building) |
MDV49964 | Sampford Peverell Bridge (Building) |
Search results generated by the HBSMR Gateway from exeGesIS SDM Ltd.